|
Village of
Clinton
|
|
Oneida County, NY
|
|
Stormwater Management
Introduction to the Stormwater Management Program and PlanDuring the 1990's, the United States Environmental Protection Agency (EPA) amended the Clean Water Act (CWA) and created a two-phased national program to address water pollution emanating from stormwater runoff. Phase I of the program was designed to address stormwater discharges from the nations' largest cities. Phase II of the program was designed to address stormwater discharges from smaller Municipal Separate Storm Sewer Systems (MS4s) (or those that are located in urbanized areas with a population less than 100,000). Under both phases of the program, operators of these systems are required to obtain National Pollution Discharge Elimination System (NPDES) permit coverage for their stormwater discharges. Through delegation by the federal government, New York State is administering these program requirements through the NYS Department of Environmental Conservation (DEC). The NYS DEC is using two different General Permits as the framework for managing stormwater across the state. The State's program requires operators of construction sites to obtain coverage under the "SPDES General Permit for Stormwater Discharges from Construction Activities". Operators of regulated Municipal Separate Storm Sewer Systems (MS4s) must obtain coverage under the "SPDES General Permit for Stormwater Discharges from Municipal Separate Storm Sewer Systems. The Village of Clinton is considered to be a small MS4 and is, therefore, required to comply with the Phase II Stormwater regulations. The Phase II regulations require that a regulated MS4 must "develop, implement and enforce a Stormwater Management Program (SWMP) designed to reduce the discharge of pollutants from the MS4 to the Maximum Extent Practicable (MEP) in order to protect water quality and to satisfy the requirements of the Clean Water Act". A regulated MS4's Stormwater Management Program must satisfy the requirements for each of six required program components, known as Minimum Control Measures (MCMs). These control measures are:
A Notice of Intent (NOI) for the Village of Clinton to obtain coverage under the MS4 General Permit has been filed with the NYS DEC and summarizes the best management practices (BMPs) and activities that were selected to meet the six minimum measures. A copy of the NOI is provided below. Activities undertaken to address each minimum control measure are further detailed in the corresponding web-pages.
The General Permit for Stormwater Discharges from MS4s requires the development of a Stormwater Management Program Plan (SWMPP) to document developed, planned and implemented stormwater program elements. In an effort to comply with this requirement, the Village of Clinton MS4 has developed this website to serve as that Stormwater Management Program Plan. In accordance with the NYS Department of Environmental Conservation's (NYS DEC) guidance, this SWMP plan generally describes how pollutants in stormwater runoff will be controlled within our community and/or designated MS4 area. This SWMP plan includes a detailed written explanation of all management practices, activities and other techniques that the MS4 has developed, planned and implemented to meet the federal and state requirements. Information included in the Notice of Intent (NOI) is reflected in this SWMP plan but, it should be recognized that the SWMP plan is considered a separate and more inclusive document. The Village of Clinton stormwater management program and plan includes measurable goals for each of the management practices and activities we have selected to reduce pollutants in stormwater to the maximum extent practicable. These measurable goals are identified to help the MS4 assess the status and progress of its program. Other elements of the stormwater management program and plan include: the identification and inclusion of time lines, schedules and milestones for development and implementation; copies of local laws and ordinances; inter-municipal agreements and other legal authorities; staffing and staff development programs and organization charts; program budgets; policy, procedures, and materials for each minimum measure; outfall and stormwater system maps; operation and maintenance schedules; documentation of public outreach efforts and public comments; a summary of construction site Stormwater Pollution Prevention Plans and review letters, and construction site inspection reports. This web-based format will allow the Village of Clinton MS4 to easily record, assess and modify program and plan elements as needed. This SWMP plan will be revised regularly to incorporate any new or modified BMPs or measurable goals. The plan will be made readily available to the MS4's staff, to the public, and to regulators, such as NYS DEC and US EPA staff.
|
|
| |
|